Piawaian Penerimaan Pintu Kebakaran JIAHUI
?Q: What are the key acceptance criteria for JIAHUI fire doors during installation and final inspection???
?A:?? JIAHUI fire doors must comply with rigorous national and industry standards to ensure fire integrity, structural stability, and operational reliability. The acceptance process spans three phases: ?pre-installation checks, ?installation execution, and ?post-installation validation. Below are the critical criteria:
?1. Pre-Installation Preparation?
?Dimensional Compliance:
Wall opening dimensions must be verified before installation, with tolerances ??≤±5mm? in width/height. Deviations exceeding this require structural correction prior to door fitting.
?Embedded Components:
All pre-embedded steel plates (e.g., anchor points) must undergo ?full-penetration welding. Welded joints require complete anti-rust coating (e.g., epoxy primer) to prevent corrosion.
?2. Installation Execution?
?Alignment Precision:
Vertical deviation of the door frame: ??≤3mm per meter? (measured with a laser level).
Horizontal deviation: ??≤2mm per meter? (checked via precision level).
Frame misalignment compromises sealing and must be rectified immediately.
?Gap Management:
Clearance between door leaf and frame must be ??≤3mm? on all sides (hinge, lock, top). Gaps exceeding this require adjustment or reseating. All seams must be filled with ?intumescent fire sealant? (e.g., graphite-based strips) to block smoke/flame penetration.
?Closer Calibration:
After installation, door closers must enable automatic closure when the door is opened ?**≥90°. Closers failing to reset within ??≤60 seconds**? or exhibiting resistance >80N force are non-compliant.
?3. Final Inspection & Testing?
?Comprehensive Functional Checks:
?Seals: Fire-resistant seals (e.g., ceramic silicone strips) must adhere fully to the frame with ?zero gaps or peeling.
?Hardware: Hinges, locks, and closers must operate smoothly without jamming, deformation, or excessive force (>80N). Rupa: Permukaan mesti bebas daripada kemek, karat atau kecacatan salutan (mengikut GB 12955-2008). Pengesahan Prestasi Pihak Ketiga: Pintu sampel kelompok (minimum 1 setiap 50 unit) mesti menjalani ujian makmal bebas mengikut GB/T 7633 atau ISO 834, termasuk: Rintangan Api: Mengekalkan integriti struktur dan penebat untuk tempoh yang dinilai (cth., 90 minit untuk Gred A). Kebocoran Asap: Kebocoran udara ≤1.5 m3/(m·j) pada perbezaan tekanan 50Pa. Laporan ujian mesti dihantar sebelum kelulusan projek. Dokumentasi & Pematuhan Rekod Wajib: Pensijilan kilang (kelulusan ISO/FM), laporan ujian produk dan log pemasangan. Sijil pemeriksaan pihak ketiga untuk 耐火性能 (rintangan api) dan 气密性 (kedap udara). Pengendalian Ketidakpatuhan: Pintu yang gagal memenuhi mana-mana pusat pemeriksaan memerlukan pemulihan (cth., pengedap semula, penggantian perkakasan) dan pemeriksaan semula. Kegagalan berterusan mencetuskan penolakan kelompok.
Dapatkan harga terkini? Kami akan bertindak balas secepat mungkin (dalam masa 12 jam)